• George supervising work 12:00 noon 19 July
  • 1:00 pm Material being transported from the bottom
  • 3:00 pm 50% completed, raked, seeded and mulched 19 July 2005
  • 3:30 pm One more day and slope will be completed
  • Bank interior 2 August 2005
  • 9 August 2005 Excavation for new wall East end of property
  • 9 August 2005
  • Excavation for MESA wall
  • 15 August 2005 Excavation halted due to water problems!
  • 15 August 2005, we need to install drainage to control water!
  • 15 August thru 17 August dewatering with pumps again!
  • 17 August still pumping 24 / 7
  • 17 August 2005 installing drain line!
  • 17 August 2005 First 50 feet of trench drain, to pump chamber!
  • 18 August 2005 Foundation and drainage for new MESA wall
  • 18 August 2005 Installing crushed stone for MESA wall base and drainage!
  • 18 August 2005 Removal of excess fill from site!
  • 19 August 2005 Foundation of MESA wall in and first courses being laid!
  • 19 August 2005 Backfilling and compaction of MESA wall!
  • First day of seting MESA wall!
  • End of the first day, stopped by rain 19 August 2005
  • 22 August 2005 Wall continues!
  • 23 August 2005, wall continues!
  • 22 August 2005 MESA wall being backfilled with crushed stone!